    BIO Summary

    Dr. Eul-Bum Lee has about 35 years of experience in construction industry and academia/research. Currently, working as a full-professor in GIFT & IME Department of POSTECH University in Korea since 2012, Dr. Lee has focused his research on engineering and project management, including contract, financing, scheduling and cost, and construction IT. He is actively involved in the academic and professional communities, serving as committee members and journal editors. His research work has been published in about 50 peer-reviewed (SCI) journal papers and 60 conference proceedings. His graduate degree is from the University of California at Berkeley-Engineering Project Management, and thereafter Dr. Lee has worked at U.C. Berkeley as a research faculty for 12 years in developing various engineering management tools for the USA federal government and several state governments. Before academia career Dr. Lee spent about ten years with Hyundai Engineering and Construction for the technical coordination of international mega-projects in Asia, Europe, and North America.

    Education

    1997 - 2000 Ph.D. : Engineering Project Management (EPM) Depart. of Civil and Environ. Engineering. University of California at Berkeley
    1986 – 1988 M.S. : Department of Civil Engineering, Korean Advanced Institute of Science and Technology (KAIST), Seoul, Korea
    1982 – 1986 B.S. : Civil (Agricultural) Engineering, Seoul National University, Seoul, Korea

    PROFESSIONAL EXPERIENCE

    2012 - Present; Professor in Univ. of Pohang Science & Technology (POSTECH), Graduate Institute of Ferrous Technology (GIFT)
    & Graduate School of Eng. Mastership (GEM), PSL (Project Management and Systems Engineering Lab);
    Joint Faculty of Department of Industrial and Management Engineering.
    2012 Fall semester: Dean (Acting) of Graduate School of Engineering Mastership, POSTECH
    2000 – 2012 University of California at Berkeley, Institute of Transportation Studies Research Faculty & Principal Investigator (2001- 2012)
    Post-doctoral Researcher (2000 – 2001); Graduate Research Assistant (1998 – 2000)
    1999 – 2000 Federal Highway Administration (FHWA-USA): Intern Researcher
    1988 – 2002 Hyundai Engineering and Construction Co. Ltd.,
    mega-Projects Management Coordinator: London, San Francisco (¡¯93-¡®98)
    Project Engineer: Seoul and Singapore (¡¯91 – ¡¯93)
    Design Engineer: Seoul, Kuwait, Baghdad (¡®88 – ¡¯90)

    PROFESSIONAL QUALIFICATION

    - P.E (Professional Engineer – Civil Structure Design: ±¸Á¶¼³°è Àü¹®±â¼ú»ç) since 1998
    - P.M.P (Project Management Professional) since 2002

    PROFESSIONAL & ACADEMIC ACTIVITY

    2019 – present: Editorial Board / guest Editor of Energies Journal (SCIE);
    https://www.mdpi.com/journal/energies/special_issues/Applications_Engineering_Digitalization_Construction_IT
    2018 – present: Editorial Board / Section Editor of Sustainability Journal (SCI); (MDPI AG/Swiss);
    http://www.mdpi.com/journal/sustainability http://www.mdpi.com/journal/sustainability/editors
    2012 – 2018. Mar: Editorial Board / academic Editor of Journal of Construction Engineering (Hindawi Publication/India);
    https://www.hindawi.com/journals/jcen/
    2018 – present: Editorial Board / academic Editor of Advances in Civil Engineering (SCI-E)
    https://www.hindawi.com/journals/ace/editors/
    2003 – 2012: Committee: Transportation Research Board: Construction Management (AFH10)
    2001 – present: Journal Reviewer: (ASCE J. of Const. Eng. and Management; J. of Trans. Eng; J, of Infra. Systems; Journal of Transportation Research Board
    2012 – present: Director for KICEM (Korean Institute of Construction Engineering Management)
    2018 – present: Committee MoTIE/KIET Smart-engineering (»êÀںΠ½º¸¶Æ®¿£Áö´Ï¾î¸µ ±â¼ú°³¹ßÀ§¿ø)

    RESEARCH INTEREST & FOCUS

    - Engineering project management (schedule-cost integration and PMIS)
    - Contract/claims and risk management
    - Engineering economics and financial sustainability
    - Building information modeling (3D-4D-5D-BIM)
    - Construction IT; smart-engineering and digitalization
    - Infrastructure and heavy construction management
    - National Research Participated (USA)
    1. Strategic Highway Research Program (SHRP 2): R-03 ¡°Identifying and Reducing Worker, Inspector, and Manager Fatigue in Rapid Renewal Environments¡±, Transportation Research Board (TRB), National Academy of Sciences (NAS), Battelle (leader), 2009-2012.
    2. Strategic Highway Research Program (SHRP 2): R-05 ¡°Modular Pavement Technology¡±, Transportation Research Board (TRB), National Academy of Sciences, Fugro (leader), 2008-2011.
    3. Strategic Highway Research Program (SHRP 2): R-23 ¡°Using Existing Pavement in Place and Achieving Long Life¡±, TRB, NAS, Nichols (leader), 2008-2011.
    4. Federal Highway Administration (FHWA): 08-R-00027 ¡°Deployment, Delivery, and Implementation of Advanced Concrete Pavement Technology Products¡±, US Department of Transportation, Fugro (leader), 2008-2011.

    ACADEMIC SUPERVISION

    59 Graduate students (43 MS and 1 PH.D. students at POSTECH, 15 Students at UC Berkeley)

    AWARDS

    - 2007 Global Road Achievement Award : International Road Federation (IRF) – for CA4PRS software
    - 2005 Excellence in Transportation Awards for Innovations: California Department of Transportation
    - 2001 Marlin J. Knutson Award: Technical Achievement, American Concrete Pavement Association
    - 2000 Steve White Award, Project Management Institute, Northern California Region

    INVENTOR (AUTHORSHIP)

    - ƯÇã (±¹³»¿Ü Ãâ¿ø/µî·Ï)=8°Ç
    - ¼ÒÇÁÆ®¿þ¾îµî·Ï=1°Ç
    - Authorship=1°Ç

  • Publications

    PUBLICATIONS

    ¡Ü Journal Papers = 69 SCI ranked peer-reviewed journals
    ¡Ü Scopus citations = 478 citations (2021.09.17)
    - https://www.scopus.com/authid/detail.uri?authorId=7406967942
    - https://orcid.org/0000-0001-8885-1798
    Articles in Archival Journals
    1. Lee, Sang-Mok; Choi, So-Won; and Lee, Eul-Bum*, Prediction Modeling of Flue Gas Control for Combustion Efficiency Optimization for Steel Mill Power Plant Boilers Based on Partial Least Squares Regression (PLSR), Energies, 2023 September, Volume 16 (Issue 19), 6907;
    https://doi.org/10.3390/en16196907

    2. Lee, Sang-Hyuk; Choi, So-Won; and Lee, Eul-Bum*, A Question-Answering Model Based on Knowledge Graphs for the General Provisions of Equipment Purchase Orders for Steel Plants Maintenance, Electronics, 2023 June, Volume 12 (Issue 11), 2504;
    https://doi.org/10.3390/electronics12112504

    3. Choi, Jin-Seong; Choi, So-Won; and Lee, Eul-Bum*, Modeling of Predictive Maintenance Systems for Laser-Welders in Continuous Galvanizing Lines Based on Machine Learning with Welder Control Data, Sustainability, 2023 May, Volume 15 (Issue 9), 7676;
    https://doi.org/10.3390/su15097676

    4. Yang, Sun-Feel; Choi, So-Won; and Lee, Eul-Bum*, A Prediction Model for Spot LNG Prices Based on Machine Learning Algorithms to Reduce Fluctuation Risks in Purchasing Prices, Energies, 2023 May, Volume 16 (Issue 11), 4271;
    https://doi.org/10.3390/en16114271

    5. Choi So-Won; Seo, Bo-Guk; and Lee, Eul-Bum*, Machine Learning-Based Tap Temperature Prediction and Control for Optimized Power Consumption in Stainless Electric Arc Furnaces (EAF) of Steel Plants, Sustainability, 2023 April, Volume 15 (Issue 8), 6393;
    https://doi.org/10.3390/su15086393

    6. Cha, Ho-Jin; Choi, So-Won; Lee, Eul-Bum*; and Lee, Duk-Man, Knowledge Retrieval Model Based on a Graph Database for Semantic Search in Equipment Purchase Order Specifications for Steel Plants, Sustainability, 2023 April, Volume 15 (Issue 7), 6319;
    https://doi.org/10.3390/su15076319

    7. Choi, So-Won; and Lee, Eul-Bum*, Contractor¡¯s Risk Analysis of Engineering Procurement and Construction (EPC) Contracts Using Ontological Semantic Model and Bi-Long Short-Term Memory (LSTM) Technology, Sustainability, 2022 June, Volume 14 (Issue 11), 6938;
    https://doi.org/10.3390/su14116938

    8. Kim, Chae-Yeon; Jeong, Jong-Gwan; Choi, So-Won; and Lee, Eul-Bum*, An AI-Based Automatic Risks Detection Solution for Plant Owner¡¯s Technical Requirements in Equipment Purchase Order, Sustainability, 2022 August, Volume 14 (Issue 16), 10010.
    https://doi.org/10.3390/su141610010

    9. Choi, So-Won; Lee, Eul-Bum*; Kim, Jong-Hyun, Engineering Machine-Learning Automation Platform (EMAP): The Engineering Machine-Learning Automation Platform (EMAP): A Big-Data-Driven AI Tool for Contractors¡¯ Sustainable Management Solutions for Plant Projects, Sustainability, 2021 September, Volume 13 (Issue 18), 10384;
    https://doi.org/10.3390/su131810384

    10. Park, Min-Ji; Lee, Eul-Bum*; Lee, Seung-Yeab; and Kim, Jong-Hyun, A Digitalized Design Risk Analysis Tool with Machine-Learning Algorithm for EPC Contractor¡¯s Technical Specifications Assessment on Bidding, Energies, 2021 September, Volume 14 (Issue 18), 5901;
    https://doi.org/10.3390/en14185901

    11. Choi, Su Jin; Choi, So Won; Kim, Jong Hyun; Lee, Eul-Bum*, AI and Text-Mining Applications for Analyzing Contractor¡¯s Risk in Invitation to Bid (ITB) and Contracts for Engineering Procurement and Construction (EPC) Projects, Energies, 2021 July, Volume 14 (Issue 15), 4632;
    https://doi.org/10.3390/en14154632

    12. Anh, Joseph; Park, Moonseo; Lee, Hyun-Soo; Ahn, Sung Jin; Kwon, Nahyun; Lee, Eul-Bum*; and Kim, Yonggu, Performance Evaluation of Normalization-based CBR Models for Improving Construction Cost Estimation, Automation in Construction, 2020 November, Volume 119 (103329);
    https://doi.org/10.1016/j.autcon.2020.103329

    13. Alleman, Douglas; Lee, Eul-Bum*, Mitigating the Legal Challenges of Imposing Disincentives on Non-Performing Transportation Projects, Journal of Engineering, Construction and Architectural Management, 2020 October, volume 27 (Issue 10), pp. 2859-2891;
    https://doi.org/10.1108/ECAM-04-2019-0188

    14. Lee, Eul-Bum*; Alleman, Douglas*; Thomas, David; Kim, Chang-Mo, Integrating CA4PRS V3 Road Widening Schedule Module into US Highway Early Constructability Review Process – California SR-91 Corridor Improvement Program Case Study, Transport, 2020 January, volume 35 (1), pp.1-19;
    https://doi.org/10.3846/transport.2019.11650

    15. Shin, Hee-Kwan; Cho, Jae-min; Lee, Eul-Bum*, Electrical Power Characteristics and Economic Analysis of Distributed Generation System Using Renewable Energy: Applied to Iron and Steel Plants, Sustainability, 2019 November, Volume 11 (Issue 22), 6199;
    https://doi.org/10.3390/su11226199

    16. Kang, Seong-Oh; Lee, Eul-Bum*; Baek, Hum-Kyung, A Digitization and Conversion Tool for Imaged Drawings to Intelligent Piping and Instrumentation Diagrams (P&ID), Energies, 2019 July, volume 12 (issue 13), 2593; https://doi.org/10.3390/en12132593

    17. Kim, Myung-Hun; Lee, Eul-Bum*, A Forecast Model for the Level of Engineering Maturity Impact on Contractor's Procurement and Construction Costs for Offshore EPC Megaprojects, Energies, 2019 June, volume 12 (issue 12), 2295; https://doi.org/10.3390/en12122295

    18. Le, Chau; Le, Tuyen; Jeong, H. David; and Lee, Eul-Bum*, Geographic Information System-Based Framework for Estimating and Visualizing Unit Prices of Highway Work Items, Journal of Construction Engineering and Management, 2019 May, Volume 145 (Issue 8);
    https://doi.org/10.1061/(ASCE)CO.1943-7862.0001672

    19. Son, Byeong-yoon; Lee, Eul-Bum*, Using Text Mining to Estimate Schedule Delay Risk of 13 Offshore Oil and Gas EPC Case Studies During the Bidding Process, Energies, 2019 May, volume 12(issue 10), 1956;
    http://dx.doi.org/10.3390/en12101956

    20. Cho, Dong-Jin; Lee, Eul-Bum*; Cho, Jae-Min; and Alleman, Douglas, Reducing the Superheating of Extraction Stream on Advanced-Ultra Super Critical Power Plants with Regenerative Turbines in South Korea: An Economic Analysis, Energies, 2019 May, volume 12 (issue 9), 1681;
    https://doi.org/10.3390/en12091681

    21. Kim, Dong-Hyun; Lee, Eul-Bum*; Jung, In-Hyeo; and Alleman, Douglas, The Efficacy of the Tolling Model¡¯s Ability to Improve Project Profitability on International Steel Plants, Energies, 2019 March, volume 12 (issue 7), 1221;
    https://doi.org/10.3390/en12071221

    22. Yi, Daekyoung; Lee, Eul-Bum*; Ahn, Junyong, Onshore Oil and Gas Design Schedule Management Process Through Time-Impact Simulations Analyses, Sustainability, 2019 March, volume 11 (issue 6), 1613;
    https://doi.org/10.3390/su11061613

    23. Kim, Myung-Hun; Lee, Eul-Bum*; Choi, Han-Suk, A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects, Sustainability, 2019 February, volume 11 (issue 5), 1256;
    https://doi.org/10.3390/su11051256

    24. Jeong, Yu-Cheol; Lee, Eul-Bum*; Alleman, Douglas, Reducing Voltage Volatility with Step Voltage Regulators: A Life-Cycle Cost Analysis of Korean Solar Photovoltaic Distributed Generation, Energies, 2019 February, volume 12 (issue 4), 652;
    https://doi.org/10.3390/en12040652

    25. Kim, Min-Sung; Lee, Eul-Bum*; Jung, In-Hye, and Alleman, Douglas, Risk Assessment and Mitigation Model for Overseas Steel-plant Projects Investment with Analytic Hierarchy Process – Fuzzy Inference System, Sustainability, 2018 December, volume 10 (issue 12), 4780;
    https://doi.org/10.3390/su10124780

    26. Jeong, Ho-Hyun; Lee, Eul-Bum*; Alleman, Douglas; Ore Composition¡¯s Impact on Smelting Profitability: An Optimum Pricing Index Model for Long-Term Nickel Ore Feedstock Purchasing Agreements, Applied Sciences, 2018 November, volume 8 (issue 11), 2100;
    https://doi.org/10.3390/app8112100

    27. Kim, Yang-Kon; Lee, Eul-Bum*; Optimization Simulation, Using Steel Plant Off-Gas for Power Generation: A Life-Cycle Cost Analysis Approach, Energies, 2018 October, volume 11 (issue 11), 2884;
    https://doi.org/10.3390/en11112884

    28 Lee, Hyun-Chul; Lee, Eul-Bum*; Alleman, Douglas; Schedule Modeling to Estimate Typical Construction Durations and Areas of Risk for 1000 MW Ultra-Critical Coal-Fired Power Plants, Energies, 2018 October, volume 11 (issue 10), 2850;
    https://doi.org/10.3390/en11102850

    29. Hong, Chul-Seung and Lee, Eul-Bum*, Power Plant Economic Analysis: Maximizing Lifecycle Profitability by Simulating Preliminary Design Solutions of Steam-Cycle Conditions, Energies, 2018 August, volume 11 (issue 9), 2245;
    https://doi.org/10.3390/en11092245

    30. Ji, Sae-Hyun; Ahn, Joseph; Lee, Eul-Bum*; Yonggu Kim, Learning Method for Knowledge Retention in CBR Cost Models, Automation in Construction, 2018 December, volume 96, pp. 65-74; https://doi.org/10.1016/j.autcon.2018.08.019

    31. Lee, Chi-Joo; Lee, Chiheyon; Lee, Eul-Bum*, A Method for Analyzing the Effect of Implementing An Enterprise System Based on the Complexity of Activities, Journal of Civil Engineering and Management, 2018 November, volume 24 (issue 7), pp. 526-536;
    https://doi.org/10.3846/jcem.2018.6130

    32. Lee, Chi-Joo; Lee, Chiheyon; Lee, Eul-Bum*, Analysis of the Causes and Level of Maintenance for Enterprise Systems in Construction Companies, Journal of Civil Engineering and Management, 2018 October, volume 24 (issue 6), pp. 499-507;
    https://doi.org/10.3846/jcem.2018.5635

    33. Kim, Do-Kyun.; NG, William; Hwang, O.J.; Shon, J.M.; Lee, Eul-Bum*, Recommended Finite Element Formulations for the Analysis of Offshore Blast Walls in an Explosion, Latin American Journal of Solids and Structures, 2018 August, volume 15 (10);
    https://www.lajss.org/index.php/LAJSS/article/view/5172

    34. Lee, Chi-Joo; Won, Jong-Sung Won and Lee, Eul-Bum*, Method for Predicting Raw Material Prices for Product Production over Long Periods, Journal of Construction Engineering and Management, 2018 October, volume 145 (issue 1);
    https://doi.org/10.1061/(ASCE)CO.1943-7862.0001586

    35. Kim, Myung-Hun; Lee, Eul-Bum*, and Choi, Han-Suk; Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractors¡¯ Schedule-Cost Performance for Offshore Oil and Gas EPC Projects, Sustainability, 2018 July, volume 10 (issue 7), 2469;
    https://doi.org/10.3390/su10072469

    36. Kim, D.K.; Wong, E.W.C.; Lee, Eul-Bum*; Yu, S.Y.; Kim, Y.T., A Method for the Empirical Formulation of Current Profile, Ships and Offshore Structures, 2018 June, volume 14 (issue 2);
    https://doi.org/10.1080/17445302.2018.1488340

    37. Jo, Sung-Hwan; Lee, Eul-Bum*, and Pyo, Kyoung-Youl, Integrating A Procurement Management Process into Critical Chain Project Management (CCPM): A Case-Study on Oil and Gas Projects, the Piping Process¡±, Sustainability, 2018 May, volume 10 (issue 6), 1817;
    https://doi.org/10.3390/su10061817

    38. Yoo, Jae-Il; Lee, Eul-Bum*; and Choi, Jin-Woo, Balancing Project Financing and Mezzanine Project Financing with Option Value to Mitigate Sponsor¡¯s Risks for Overseas Investment Projects, Sustainability, 2018 May, volume 10 (issue 5), 1498;
    https://doi.org/10.3390/su10051498

    39. Kim, Yonggu; Lee, Eul-Bum*, Optimal Investment Timing with Investment Propensity Using Fuzzy Real Options Valuation, International Journal of Fuzzy Systems, 2018 May, volume 20;
    https://doi.org/10.1007/s40815-018-0493-4

    40. Kim, Yonggu and Lee, Eul-Bum*, A Probabilistic Alternative Approach to Optimal Project Profitability Based on the Value-at-Risk, Sustainability, 2018 March, volume 10 (issue 3), 747;
    https://doi.org/10.3390/su10030747

    41. Lee, Eul-Bum* and Alleman, Douglas, Ensuring Efficient Incentive and Disincentive Values for Highway Construction Projects: A Systematic Approach Balancing Road User, Agency and Contractor Acceleration Costs and Savings, Sustainability, 2018 March, volume 10 (issue 3), 701;
    https://doi.org/10.3390/su10030701

    42. Lee, Eul-Bum*; Thomas, D. K.; Alleman, D., Incorporating Road User Costs into Integrated Life-Cycle Cost Analyses for Infrastructure Sustainability: A Case Study on Sr-91 Corridor Improvement Project (Ca), Sustainability, 2018 January, volume 10 (issue 1), 179;
    https://doi.org/10.3390/su10010179; SI: Sustainable Urban and Rural Development

    43. Kim, Yong-gu; Shin, Kee-young; Ahn, Joseph; and Lee, Eul-Bum*, Probabilistic Cash Flow-Based Optimal Investment Timing Using Two-Color Rainbow Options Valuation for Economic Sustainability Appraisement, Sustainability, 2017 October, volume 9 (issue 10), 1781;
    https://doi.org/10.3390/su9101781; SI: Sustainable Urban & Rural Development

    44. Lee, C.J.* and Lee, Eul-Bum*, A prediction method of real discount rate to improve accuracy of life-cycle cost analysis, Energy and Buildings, impact factor=4.457, 2017 January, volume 135, pp. 225–232;
    http://dx.doi.org/doi:10.1016/j.enbuild.2016.11.020

    45. Jackson, J. E.; Sanquist, T.; Campbell, J.; Lee, Eul-Bum*; Hans P.A.; Van Dongen, H. P., Fatigue Risk Management for Construction Worker on Rapid Renewal Highway Projects, Transportation Research Record , Journal of the Transportation Research Board, 2013 October National Research Council, Washington, D.C., pp. 11-18;
    https://doi.org/10.3141/2347-02

    46. Wang, Ting; Lee, In-Sung; Kendal, Alissa; Harvey, John; Lee, Eul-Bum*; Kim, Chang-Mo, Life Cycle Energy Consumption and GHG Emission from Pavement Rehabilitation with Different Rolling Resistance, Journal of Cleaner Production, 2012 September, volume 33, pp. 86-96;
    https://doi.org/10.1016/j.jclepro.2012.05.001

    47. Kim, C.M.; Lee, Eul-Bum*; Harvey, J. T.; Fong, A.; Lott, R., Automatic Sequence Selection and Cost Calculation for Maintenance and Rehabilitation in Highway Life-Cycle Cost Analysis (LCCA), International Journal of Transportation Science and Technology (IJTST): Sustainable Transportation Technology and Policy, 2015 March, volume 4 (issue 1), pp. 86-96;
    https://doi.org/10.1260/2046-0430.4.1.61

    48. Lee, Eul-Bum*; Kim, C. M.; Ghafari, N.; and Brink, G., Value Analysis Using Performance Attributes Matrix for Highway Rehabilitation Projects: California Interstate 80 Sacramento Case, Transportation Research Record, Journal of the Transportation Research Board, 2011 January, No. 2228, TRB, National Research Council, Washington, D.C., pp. 34-43;
    https://doi.org/10.3141/2228-05

    49. Lee, Eul-Bum*; Kim, C.M.; and Harvey, J. T., Selection of Pavement for Highway Rehabilitation Based on Life-Cycle Cost Analysis: Validation of California Interstate 710 Project, Phase 1, Transportation Research Record, Journal of the Transportation Research Board, 2011 January, No. 2227, TRB, National Research Council, Washington, D.C., pp. 23-32;
    https://doi.org/10.3141/2227-03

    50. du Plessis, L.; Nokes, W. A.; Mahdavi, M.; Burmas, N.; Holland, T.J.; Lee, Eul-Bum*, Economic Benefits Assessment of Accelerated Pavement Testing Research in California: Case Study, Transportation Research Record, Journal of the Transportation Research Board, 2011 January, No. 2225, TRB, National Research Council, Washington, D.C., pp. 137-1461;
    https://doi.org/10.3141/2225-15

    51. Choi, K.H.; Lee, Eul-Bum*; and Ibbs, C.W., Multifaceted Public Outreach and Cost-Benefit Analysis for Its Effectiveness Validation, Journal of Construction Management and Economics, 20099 September, volume 27 (issue 8), pp. 771-782;
    https://doi.org/10.1080/01446190903096591

    52. Lee, Eul-Bum*; Choi, K.H.; and Lim, D. S., Streamlined Strategies for Faster, Less Traffic-Disruptive Highway Rehabilitation in Urban Networks, Transportation Research Record, Journal of the Transportation Research Board, 2008 January, No. 2081, TRB, National Research Council, Washington, D.C., pp. 38-45;
    https://doi.org/10.3141/2081-04

    53. Lee, Eul-Bum* and Thomas, D. K., State-of-practice Technologies on Accelerated Urban Highway Rehabilitation: I-15 California Experience, Journal of Construction Engineering and Management, 2007 February, ASCE, volume 133 (issue 2), pp. 105-113;
    https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(105)

    54. Lee, Eul-Bum*; Lee, H.J.; and Ibbs, C.W., Productivity Aspects of Urban Freeway Rehabilitation with Accelerated Construction, Journal of Construction Engineering and Management, 2007 October, ASCE, volume 133 (issue 10), pp. 798-806;
    https://doi.org/10.1061/(ASCE)0733-9364(2007)133:10(798)

    55. Lee, Eul-Bum*; Kim, C.M.; and Harvey, J.T., Implementation of automated travel-time information and public reaction on urban highway rehabilitation, Journal of Transportation Engineering, 2006 October, ASCE, volume 132 (issue 10), pp. 808-816;
    https://doi.org/10.1061/(ASCE)0733-947X(2006)132:10(808)

    56. Lee, Eul-Bum* and Choi, K.H., Fast-Track Construction for Concrete Pavement Rehabilitation: California Urban Highway Network, Transportation Research Record, Journal of the Transportation Research Board, 2006 January, No. 1949, TRB, National Research Council, Washington, D.C., pp. 3-10;
    https://doi.org/10.1177/0361198106194900101

    57. Lee, Eul-Bum* and Kim, C.M., Automated Work-Zone Information System on Urban Freeway Rehabilitation: California Implementation, Transportation Research Record, Journal of the Transportation Research Board, 2006 January, No. 1948, TRB, National Research Council, Washington, D.C., pp. 77-85;
    https://doi.org/10.3141/1948-09

    58. Lee, Eul-Bum*; Lee, H.J.; and Harvey, J.T., Fast-Track Urban Freeway Rehabilitation with 55-hour Extended Weekend Closures: I-710 Long Beach Case Study, Journal of Construction Engineering and Management, 2006 May, ASCE, volume 132 (issue 5), pp. 465-472;
    https://ascelibrary.org/doi/abs/10.1061/(ASCE)0733-9364(2006)132:5(465)

    59. Lee, Eul-Bum*; Harvey, J.T.; and Samadian, M., Knowledge-based Scheduling Analysis Software for Highway Rehabilitation and Reconstruction Projects, Transportation Research Recor, Journal of the Transportation Research Board, 2005 January, No. 1907, TRB, National Research Council, Washington, D.C., pp. 15-14;
    https://doi.org/10.1177/0361198105190700103

    60. Lee, Eul-Bum*; Lee, H.J.; and Akbarian M., Accelerated Pavement Rehabilitation and Reconstruction with Long-life Asphalt Concrete on High-trafficked Urban Highway, Transportation Research Record, Journal of the Transportation Research Board, 2005 January, No. 1905, TRB, National Research Council, Washington, D.C., pp. 56-66;
    https://doi.org/10.1177/0361198105190500106

    61. Lee, Eul-Bum*; Thomas, D. K.; and Bloomberg, L., Planning Urban-Highway Reconstruction with Traffic Demand Affected by Construction Schedule, Journal of Transportation Engineering, 2005 October, ASCE, volume 11 (issue 4), pp. 752-761;
    https://doi.org/10.1061/(ASCE)0733-947X(2005)131:10(752)

    62. Lee, Eul-Bum*; Harvey, J.T.; and Thomas, D. K., Integrated Design/Construction/Operations Analysis for Fast-track Urban Freeway Reconstruction, Journal of Construction Engineering and Management, 2005 May, ASCE, volume 131 (issue 12), pp. 1283-1291;
    https://doi.org/10.1061/(ASCE)0733-9364(2005)131:12(1283)

    63. Lee, Eul-Bum*; and Ibbs, C.W, Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies, Journal of Construction Engineering and Management, 2005 April, ASCE, volume 131 (issue 4), pp. 449-458;
    https://doi.org/10.1061/(ASCE)0733-9364(2005)131:4(449)

    64. Lee, Eul-Bum*; Ibbs, C.W.; and Thomas, D. K., Minimizing Total Cost for Urban Freeway Reconstruction with Integrated Construction/Traffic Analysis, Journal of Infrastructure Management Systems, 2005 December, ASCE, volume 11 (issue 4), pp. 250-257;
    https://doi.org/10.1061/(ASCE)1076-0342(2005)11:4(250)

    65. Lee, Eul-Bum*; Harvey, J.T.; Ibbs, C.W.; and St. Martin, J., Constructability Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors, Transportation Research Record, Journal of the Transportation Research Board, 2002 January, No. 1813, TRB, National Research Council, Washington, D.C., pp. 285-294;
    https://doi.org/10.3141/1813-34

    66. Lee, Eul-Bum*; Roesler, J.R.; Harvey, J.T.; and Ibbs, C.W., Case Study of Urban Concrete Pavement Reconstruction on Interstate 10, Journal of Construction Engineering and Management, 2002 February, ASCE, volume 128 (issue 1), pp. 49-56;
    https://doi.org/10.1061/(ASCE)0733-9364(2002)128:1(49)

    67. Timm, D.; Voller, V.R; Lee, Eul-Bum*; and Harvey, J.T., Calcool: A Multi-layer Asphalt Pavement Cooling Tool for Temperature Prediction During Construction, The International Journal of Pavement Engineering, 2007 February, volume 2 (issue 3), pp. 169-185;
    https://doi.org/10.1080/10298430108901725

    68. St. Martin, J; Harvey, J.T.; Long, F.; Lee, Eul-Bum*; Monismith, C.L.; and Herritt, K., Long-Life Rehabilitation Design and Construction: I-710 Freeway, Long Beach, California, Transportation Research Circular, 2001 December, No 503, Transportation Research Board, National Research Council, Washington, D.C., pp. 50-55;
    https://trid.trb.org/view.aspx?id=717435

    69. Lee, Eul-Bum*; Ibbs, C.W.; Roesler, J.R.; and Harvey, J.T., Construction Productivity and Constraints for Concrete Pavement Rehabilitation in Urban Corridors, Transportation Research Record, Journal of the Transportation Research Board, 2000 January, No. 1712, TRB, National Research Council, Washington, D.C., pp. 13-22;
    https://doi.org/10.3141/1712-02

    Domestic Journal
    1. Lee, C. J., Lee, E.B.*, ¡°Analysis on Real Discount Rate for Prediction Accuracy Improvement of Economic Investment Effect¡±, Journal of KJCEM 16. 1, 101~109, JANUARY, 2015.
    BOOK (chapter editing)
    - John W. Bull (Editor), Life-Cycle Costing: For Analysis, Management and Maintenance of Civil Engineering Infrastructure; (Kim, C.M., Lee, E.B.*, Harvey, J.T., Chapter 4. Pavement type selection for highway rehabilitation based on a life-cycle cost analysis: Validation of California Interstate 710 project), ISBN-10: 1849951489, Whittles Publishing, U.K. 224 pages February 28, 2015. http://www.whittlespublishing.com/Life_Cycle_Costing

    - Gambatese, J.A. et al. (Editor), Constructability Concepts and Practice: Special Publication; (Lee, E.B.* and Sivaneswaran, N., ¡°CA4PRS: A Constructability Analysis Tool for Urban Highway Rehabilitation Projects; pp. 102-116), ISBN-10: 0784408955, Construction Institute and ASCE, 156 pages, Jan 1 2007.
    Link

    - Roh, H. Y.; Jung, I.H.; Lee, Eul-Bum*; Kim, C.Y., Smart-Tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-Plant Blast-Furnace Revamping Project in Korea, chapter of Logistics Operations and Management for Recycling and Reuse (editor: Paulina Golinska-Dawson), pp 161-173. Springer, Berlin, Germany. January 2021.
    https://doi.org/10.1007/978-3-642-33857-1
    http://www.springer.com/series/10152
    https://sciprofiles.com/publication/view/23ea0f61edef304500c9b2e31f03d35c

  • Intellectual Property

    1. Patent (ƯÇã): Ŭ¶ó¿ìµå ±â¹ÝÀÇ ¸Ó½Å·¯´× Ç÷§Æû°ú »çÀüÁ¤ÀÇ ¸ðµ¨À» È°¿ëÇÑ ¿£Áö´Ï¾î¸µ µ¥ÀÌÅÍ °ü¸® ¹× ºÐ¼® ÀåÄ¡ (ENGINEERING DATA MANAGEMENT AND ANALYSIS DEVICES USING MACHINE LEARNING FLATFORM AND PRE-DEFINED MODELS PROVIDED ON THE CLOUD: EMAP); ±èÁ¾Çö, ±ÇÁö¼ö, ÀÌÀ»¹ü, ÃÖ¼Ò¿ø; Patent no= 10-2020-0154618; ½ÂÀÎ/µî·Ï (2021.10.08)

    2. Patent (ƯÇã): Ç÷£Æ® ÇÁ·ÎÁ§Æ® »ó¼¼ ¼³°è °ü¸® ¹æ¹ý ¹× ½Ã½ºÅÛ; ÀÌÀ»¹ü, ±è¸íÈÆ; Patent no= 10-2019-0027060; ½ÂÀÎ/µî·Ï (2021.08.13)

    3. Patent (ƯÇã): Ŭ¶ó¿ìµå ±â¹ÝÀÇ ¸Ó½Å·¯´× Ç÷§Æû°ú »çÀüÁ¤ÀÇ ¸ðµ¨À» È°¿ëÇÑ ¿£Áö´Ï¾î¸µ µ¥ÀÌÅÍ °ü¸® ¹× ºÐ¼® ÀåÄ¡ (ENGINEERING DATA MANAGEMENT AND ANALYSIS DEVICES USING MACHINE LEARNING FLATFORM AND PRE-DEFINED MODELS PROVIDED ON THE CLOUD), KIM JONGHYUN, KWON JISOO, LEE EUL-BUM, CHOI SOWON, Registration no= 10-2020-0154618; Ãâ¿ø (2020.11.19).

    4. Patent (ƯÇã): µ¥ÀÌÅͺ£À̽º·Î ÀúÀåµÈ ¼³°èÁ¤º¸¸¦ ÀÌ¿ëÇÑ Áö´ÉÇü PID µµ¸éÀÇ ÀÚµ¿ÀÛ¼º¹æ¹ý (ID-2); °­¼º¿À¤ý¹éÈì°æ¤ýÀÌÀ»¹ü; Patent number= 10-2145178, ½ÂÀÎ/µî·Ï (2020.08.11);

    5. Patent (ƯÇã): Ç÷£Æ® ÇÁ·ÎÁ§Æ® »ó¼¼ ¼³°è °ü¸® ¹æ¹ý ¹× ½Ã½ºÅÛ {MANAGEMENT METHOD AND SYSTEM FOR DETAIL ENGINEERING OF PLANT PROJECTS}; Myeong-hoon Kim & Eul-Bum Lee; registration no= 10-2019-0027060; ½ÂÀÎ/µî·Ï (2021.08.13); ¹Ì±¹ ÇØ¿Ü ¹Ì±¹Ãâ¿ø¹øÈ£: 16/812,230 (2020.03.06. Ãâ¿ø¿Ï·á)

    6. Patent (ƯÇã): Ç÷£Æ® ÃÖÀû ¼³°è¸¦ À§ÇÑ ¹è°üÀÇ ÀÚµ¿ ¶ó¿ìÆà ¹æ¹ý{METHOD FOR AUTO PIPING ROUTING FOR THE MOST EFFICIENT PLANT DESGIN}; °­¼º¿À¤ý¹éÈì°æ¤ýÀÌÈñõ¤ýÀÌÀ»¹ü; Registration no= 10-2019-0179750; Ãâ¿ø (2019.12.31)

    7. Patent (ƯÇã): ±³ÅëÀÎÇÁ¶ó Àç°Ç¼³°ø»ç °ø±â´ÜÃà Àμ¾Æ¼ºê ¹× °ø±âÁö¿¬ µð½ºÀμ¾Æ¼ºê ÃÖÀû»êÁ¤¸ðµ¨¸µ (OMID); {Optimum Modeling for Incentive and Disincentive Values for Infrastructure Reconstruction Projects}; Registration no= 10-2018-0053783; ½ÂÀÎ/µî·Ï (2019.11.20)

    8. Patent (ƯÇã): À̹ÌÁöÈ­µÈ PID µµ¸é¿¡¼­ ¼³°è Á¤º¸¸¦ ÀÚµ¿À¸·Î ÀνÄÇÏ¿© ºÐ·ùÇÏ´Â ¹æ¹ý (ID-1); °­¼º¿À¤ý¹éÈì°æ¤ýÀÌÀ»¹ü; Registration no= 10-2018-0152246, ½ÂÀÎ/µî·Ï (2018-11-30)

    9. Software (Áö½ÄÀç»ê±Ç µî·Ï): EPC(ÀÌÇǾ¾) Ç÷£Æ® ¹× ¿£Áö´Ï¾î¸µ ÇÁ·ÎÁ§Æ®ÀÇ ÀÇ»ç °áÁ¤ Áö¿øÀ» À§ÇÑ °è¾à ¸®½ºÅ© ÃßÃâ ÇÁ·Î±×·¥, Æ÷Ç×°ø°ú´ëÇб³ »êÇÐÇù·Â´Ü, Ãâ¿ø/µî·Ï¹øÈ£: C-2020-040502, Ãâ¿øÀÏ: 2020-11-09

    10. Inventor of CA4PRS software: FHWA/AASHTO market-ready technologies & innovations product
  • Curriculum

    POSTECH PMC Curriculum (¼®»ç°úÁ¤ ÃÑ 8°ú¸ñ À̼ö Áß 5°ú¸ñ)


    1. Project Management Introduction
    – PM Global standards: PMBOK & PRINCE-2
    – EPC Project Management: Theory and Practice


    2. Cost Engineering
    – Cost Estimating Theory & Tools: Hard-dollar, Cleopatra
    – Cost Control (EVMS: Earned-value Management Systems) & Tools


    3. Project Financing & Engineering Economics
    – Bankability and Covenants
    – Feasibility studies & Project financial modeling: CAPM + WACC


    4. Engineering Management Guideline and Practice
    – Disciplinary Engineering Process: Revision control (EDMS)
    – 3D-4D-5D BIM & Environments (HSE; CO2 & LCA)


    5. Contract Management and Claims/Disputes
    – Liabilities & Contract negotiation and Risks management
    – Change orders, Claims management, Disputes resolutions


  • Conference

    ¡Ü Conference Proceedings - International (69 conference proceedings)
    1. Choi, So-Won; Lee, Kyu-Jeong; Cha, Ho-Jin; and Lee, Eul-Bum; Knowledge Graph-based a Purchase Order Knowledge Retrieval Model (POKREM) for Steel Plants, The 7th International Conference on Communication and Information Systems (ICCIS 2023), October 20-22, 2023, Chongqing, China;
    https://www.iccis.org/

    2. Park, Sea-Eun; Choi, So-Won; and Lee, Eul-Bum; Automated Estimation Model for Liquidated Damages in General Provisions of Equipment Purchasing Orders, The 36th US-Korea Conference (UKC 2023), August 2-5, 2023, Dallas, Texas;
    https://www.ukc.ksea.org/

    3. Park, Sea-Eun; Choi, So-Won; and Lee, Eul-Bum; Development of digital rules for optimal auto-routing design of pipe, the 8th International Symposium on Life-Cycle Civil Engineering (IALCCE 2023), July 2-6, 2023, Milan, Italy;
    https://ialcce2023.org/

    4. Choi, Sowon; Lee, Eul-Bum; 2022. Predictive Maintenance for Turbofan Engines Based on Remaining Useful Life Analysis with Machine-learning (ML) and Big-data Applications. The 4th International Conference on Big Data Engineering (BDE 2022), May 26-28, 2022, Virtual;
    http://www.bde.net

    5. Kim, Chae-Yeon; Choi, Sowon; Jeong, Jong-Gwan; Lee, Eul-Bum; 2022. Automatic Detection and Comparison Technique for General Conditions of Technical Documents. In 2022 8th International Conference on Computer Technology Applications (ICCTA 2022), May 12-14, 2022, Vienna, Austria;
    http://www.iccit.org/

    6. Choi, Seong-Jun; Choi, So-Won; Park, Min-Ji; Lee, Eul-Bum; Application of Machine-learning (ML) technology for the use of big data in the design and construction stages of the Engineering, Procurement, Construction (EPC) project, The 9th International Conference on Construction Engineering and Project Management (ICCEPM 2022), June. 20-23, 2022, Las Vegas, NV, USA;
    www.iccepm2022.com

    7. Park, Minji; Kim, Chae-Yeon; Choi, So-Won; Hwang, Jong-Hwi; Lee, Eul-Bum; Automatic conversion of table contents from PDF technical specification documents into database using AI Optical Character Recognition (OCR); The 4th International Conference on Communication and Computational Technologies (ICCCT 2022), February 26-27, 2022, Jaipur, India;
    https://www.iccct22.scrs.in/

    8. Kim, Chae-Yeon; Choi, Sowon; Jeong, Jong-Gwan; Park, Minji; Lee, Eul-Bum; An AI-based Automatic Risks Detection Solution of Plant Owner¡¯s Requirements in Equipment Purchasing-Order, paper number 8088; The 34th US-Korea Conference (UKC) 2021; December 15-18, 2021, Los Angeles, CA, USA;
    https://ukc.ksea.org/ukc2021/

    9. Kim, Chae-Yeon; Lee, Jae-Sung; Roh, Ho-Young; Lee, Eul-Bum; Application of 4D BIM Simulations for Safety and Schedule Integration of a Reconstruction Project for Oxygen Plant in Steel Works in Korea, CIGOS 2021 (6th International Conference on Geotechnics, Civil Engineering and Structures, Ha Long, Vietnam, October 28-29, 2021;
    https://cigos2021.sciencesconf.org

    10. Park, Minji; Lee, Seung-yeab; Kim, Jong-hyun; Lee, Eul-Bum; Risk Extraction and Analysis of Technical Specifications Based on Machine-Learning Algorithms for EPC Bid Documents; The 38th International Council for Research and Innovation in Building and Construction (CIB) W78 - Linked Data in Architecture and Construction research community (LDAC) Conference 2021; October 11-15, 2021, Luxembourg;
    https://www.cibw78-ldac-2021.lu/

    11. Choi, Sujin; Choi, Sowon; Lee, Seung-yeab; Lee, Eul-Bum; Syntactic Analysis for Decision-making Support System in Engineering-Procurement-Construction (EPC) Field; The 7th International Conference on Computer Technology Applications (ICCTA); July. 13-15, 2021; Vienna, Austria;
    http://www.iccit.org/iccta2021.html

    12. Lee, Seung-yeab; Kim, Hyun Soo; Lee, Eul-Bum; Development of Machine Learning based Engineering Integration Module (MEIM) for Decision Making Support in the EPC Project; The 3rd International Conference on Big Data Engineering (BDE 2021); May. 29-31, 2021; Shanghai, China;
    http://www.bde.net/

    13. Choi, Sowon; Baek, Seong-Bin; Lee, Eul-Bum; Lexicon based Natural Language Processing (NLP) and Semantic Analysis of Contractual Risks on Engineering, Procurement & Construction (EPC) projects, The 2nd International Conference on Communication and Intelligent Systems (ICCIS 2020), December. 26-27, 2020; Jaipur & Kota, India; https://iccis20.scrs.in/;
    https://www.iccis20.scrs.in/kcfinder/upload/files/Souvenir.pdf

    14. Choi, Sowon; Lee, Seung-yeab; Choi, Sujin; Lee, Eul-Bum; Application of Artificial Intelligence and Big data to Decision-making Support for Engineering-Procurement-Construction (EPC) Projects; paper number U20CEA-14-1; The 15th US-Korea Conference (UKC) 2020; December. 14 - 17, 2020, Virtual, USA;
    https://ukc.ksea.org/ukc2020/ukc-2020-awardee-list/
    Best Presentation Award Winner - CEA, Sowon Choi

    15. Jung, In-Hye, Roh, Ho-Young; Lee, Eul-Bum, Smart-tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-plant Blast-furnace Revamping Project in Korea, The 8th International Conference on Construction Engineering and Project Management (ICCEPM), December 7-8, 2020, Hong Kong;
    http://www.iccepm2019.com/

    16. Roh, Ho-Young; Hwang, Do Kyung; Jung In Hye; Lee, Eul-Bum; Smart-tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-plant Blast-furnace Revamping Project in Korea, The 15th International Congress of Logistics and SCM Systems (ICLS 2020), July 1-3, 2020, Poznan Poland;
    http://icls2020.put.poznan.pl/

    17. Cho, Jae-Min; Jang, Sin-Ae; Lee, Eul-Bum; Lee, Ju-Hoon: To develop an intelligent integrated support system for engineering project (E-PMS): DECRIS and DLDs analysis, Information Technology for Construction Conference (CIB W78), August 18-20, 2020, São Paulo, Brazil, pp. 46-57;
    http://dx.doi.org/10.46421/2706-6568.37.2020.paper004;
    http://www.pcc.usp.br/icccbe-w78-2020

    18. Lee, Jung-Hyun; Kim, Hyun-Soo; Lee, Seung-Yeob; Lee, Eul-Bum, Development of AI-based engineering Big Data integrated analysis system for decision-making support in the Engineering-Procurement-Construction (EPC) industry, The 37th CIB W78 Information Technology for Construction Conference (CIB W78), August 18-20, 2020, São Paulo, Brazil, pp. 58-68;
    http://dx.doi.org/10.46421/2706-6568.37.2020.paper005

    19. Kim, Yuri; Lee, Eul-Bum; Choi, Sujin, AI & NLP (Natural Language Processing) Applications to the Risks Management of EPC Contracts; Global EPC PM for O&G Industry, April 1-3, 2020, Amsterdam, Netherland;
    https://www.world-energy-hub.com/

    20. Kim, Yuri; Lee, Eul-Bum; Lee, Jung-hyun; Lee, Ju-Hoon, Application of Natural Language Processing (NLP) and Text-mining of Big-data to Engineering-Procurement-Construction (EPC) Bid and Contract Documents, The 6th International Conference on Data Science and Machine Learning Applications (CDMA 2020), March 4-5, 2020, Riyadh, Saudi Arabia,
    http://www.ieeepsu.org/cdma/;
    https://www.mendeley.com/catalogue/3f7f64f7-763b-3272-9bb0-0aa6df48e176/

    21. Lee, Eul-Bum, Text-mining and Natural Language Processing (NLP) Application to engineering EPC Projects Invitation to Bid (ITB) based on FIDIC Silver Book, FIDIC International Contract Users¡¯ Conference-2019, December 3rd, 2019, West London;
    https://informaconnect.com/fidic-international-contract-users/

    22. Park, Jung-Chul; Kim, Hyun-Soo; Lee, Jung-Hyun; Lee, Eul-Bum, A Study on the Application of AWP Process and Integrated Platform for Productivity Improvement in Construction Projects, KNS 2019 Fall, Seoul, Korea;
    http://2019conference.kicem.or.kr/data/pdf/P-52.pdf

    23. Cho, Jae Min; Lee, Eul-Bum, DLDs decision model using ES-based shortening algorithm, The 8th International Multi-Conference on Engineering and Technology Innovation 2019 (IMETI 2019), November 08~12, 2019, Kaohsiung, Taiwan;
    http://imeti.org/IMETI2019/

    24. Kim, Myoeong Hun; Lee, Eul-Bum; Cho, Jae Min, Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractors Schedule-Cost, No.40, The 5th International Congress on Energy Efficiency and Energy Related Materials, ENEFM 2019, October 22~28, 2019, Oludeniz (Fethye), Turkey;
    http://www.enefmcongress.org/

    25. Jung, In Hye; Roh, Ho Young.; Lee, Eul-Bum, Automatic Development of Material Requisition for Purchasing Order for EPC Projects, 2019 US-Korea Conference (UKC), August 14-17, 2019, Rosemont, IL, USA;
    https://ukc.ksea.org/ukc2019/

    26. Jung, In Hye; Rho, Ho-Young; Lee, Eul-Bum, complement of 3D scanning using image-based 3D modeling, Korea Institute of Building Information Modeling Annual Conference, June 13, 2019, Seoul, South Korea.

    27. Park, Jung-Chul; Kim, Hyun-Soo; Lee, Eul-Bum; Cho, Jae Min, Smart 4D process visualization solution using BIM, Korea Institute of Building Information Modeling Conference, June 13, 2019, Seoul, South Korea;
    http://kibim.or.kr/Conference/Conferencelist.asp?AC=0&CODE=CC20190301&B_CATE=BBC1

    28. Cho, Jae Min; Roh, Ho-Young; Lee, Eul-Bum; Kim, Hyun-Soo; AI-based big-data decision making support systems for Korean contractor¡¯s life-cycle project management of overseas Engineering-Procurement-Construction (EPC), International Conference on Big-Data Engineering (BDE 2019), June 11~13, 2019, Hong Kong, China;
    http://www.bde.net/BDE2019.html /Best Presentation Award Winner - Lee, Eul-Bum

    29. Kim, Hyun-Soo; Park, Jung-Chul; Park, Byeong-Hoon; Lee, Eul-Bum, A Study of the AI Based Engineering Big Data Integrated Analysis Support System Development Methodology, KICEM Annual Conference-2018, November 9, 2018, Seoul, Korea

    30. Pyo, Kyeong Yeol and Lee, Eul-Bum, Lessons Learned from Applying Earned Value Management System to Infrastructure Construction Project: Case Study, 2017 International Conference on Construction Engineering and Project Management (ICCEPM), October 28 – 31, 2017, Chengdu, China

    31. Lee, Eul-Bum, Intelligent- PM (Project Management) for Smart Engineering, Offshore Korea Technical Conference 2018, October 10-11, 2018, Busan, Korea

    32. Lee, Eul-Bum, Oil & Gas Project Cost Estimation: Tools & Practice, Offshore Korea Conference 2017, September 19-20, 2017, Busan, Korea

    33. Lee, Eul-Bum; Kim, Chang Mo, Implementing Application Tool of Life Cycle Cost Analysis (LCCA) for Highway Maintenance And Rehabilitation In California, The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), October 11-14, 2015, Busan, Korea

    34. Han, Ki Jeong; Kim, Yong Ho; Lee, Eul-Bum, Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Projects: Contractor¡¯s Perspective, The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), October 11-14, 2015, Busan, Korea

    35. Lee, Jung Heon; Yoon, Sang Mun; Lee, Eul-Bum, Risk-sharing Strategies on EPC Contracts: Lessons-learned from Sabine Pass Liquefaction Project, The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), October 11-14, 2015, Busan, Korea

    36. Kim, Chang-Mo; Lee, Eul-Bum, Enhancement of a Life-Cycle Cost Analysis Tool and its Implementation in California, U.S.A.: Automatic M&R Sequence Selection, The 8th International Conference on Road and Airfield Pavement Technology (ICPT), July 14-18, 2013, Taipei, Taiwan

    37. Jin, K.B.; Kim, Y.H.; Lee, Eul-Bum; Suh, S.H., Steel Plant Construction (EPC) Project Case Study: Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation, The 5th International Conference on Construction Engineering and Project Management (ICCEPM 2013), January 9-11, 2013, Orange County, California, USA

    38. Min, S.K; Lee, Eul-Bum, A Forensic Case Study of a Refinery Upgrading Project in Thailand: Lessons Learned Implementation, KICEM Conference, Nov 9-10, 2012, Daegu, Korea

    39. Song, J. H.; Lee, E. B., Enhancement of EPC Plant Project Management from Lessons Learned: A Case Study of Gas Gathering Project in Nigeria, KICEM Conference, Nov 9-10, 2012, Daegu, Korea.

    40. Kim, C.M.; Lee, Eul-Bum, Enhancement of a Life-Cycle Cost Analysis Tool and its Implementation in California, U.S.A., KICEM Conference, Nov 9-10, 2012, Daegu, Korea

    41. Pyeon, J.H.; Lee, Eul-Bum; Ellis, R.D.; Park, T.H., Cost Estimate Modeling of Transportation Management Plans for Highway Projects, Mineta Transportation Institute, San José State University, Report no. CA-MTI-12-1007, Grant no. DTRT07-G-0054;
    http://transweb.sjsu.edu/PDFs/research/1007-cost-estimate-modeling-transportation-management-highway-projects.pdf

    42. Pyeon, J.H.; Lee, Eul-Bum, Systematic Procedures to Determine Incentive/Disincentive Dollar Amounts for Highway Transportation Construction Projects, Mineta Transportation Institute, San José State University, Report no. CA-MTI-12-2908, Grant no. DTRT07-G-0054;
    http://transweb.sjsu.edu/PDFs/research/2908-highway-transportation-construction-incentive-disincentive-amounts.pdf

    43. Wang, T.; Lee, I. S.; Harvey, J.; Kendall, A.; Lee, Eul-Bum; Kim, C.M., Life Cycle Environmental Impacts From Asphalt Pavement Rehabilitation With Different Rolling Resistance, submitted to the Transportation Research Board 91st Annual Meeting, Transportation Research Board, National Research Council, Washington, D.C., January, 2012.

    44. Lee, Eul-Bum; Lim, S., W.; den Hartog, J., C.; Thomas, D., K., I-15 Ontario Project: Technology Implementation for Accelerated Concrete Pavement Rehabilitation, National Conference On Preservation, Repair, And Rehabilitation Of Concrete Pavements, FHWA, AASHTO, ACPA, April. 22–24, 2009, St.Louis,Missouri;
    http://www.fhwa.dot.gov/pavement/concrete/2009cptpconf.cfm

    45. Lee, Eul-Bum; Sivaneswaran, N.; Harvey, J.T; Lim, S.W, CA4PRS: A Decision-support Tool for Rapid Highway Renewal, Paper No.11, The 1st International Conference on Transportation Construction Management, Federal Highway Administration, Orlando, Florida, February. 9-12, 2009.

    46. Lee, Eul-Bum; Kim, C.M.; Tadi, R.R; Lim, S.W., Traffic Monitoring Study With Surveillance Systems: I-15 Devore II Rehabilitation Project In California, Paper No.30238, 15th World Congress on Intelligent Transport Systems, New York City, New York, November. 16-20, 2008.

    47. Lee, Eul-Bum; Thomas, D., Innovative Technologies And Proactive Public Outreach to Minimize Traffic Inconvenience In Urban Highway Rehabilitation, Public Roads, Federal Highway Administration, 2007.

    48. Lee, Eul-Bum; Samadian, M., Garnering Public Support by Implementing a Comprehensive Public Outreach Program, Public Involvement Poster Session (No.: P07-0573) in the Transportation Research Board 86th Annual Meeting, Transportation Research Board, National Research Council, Washington, D.C., 2007.

    49. Lee, Eul-Bum, Accelerated Long-life Asphalt Concrete Pavement Rehabilitation: I-710 Long Beach (CA) Project Experience, Road and Bridges, Scranton Gillette Communications, Inc., 2007.

    50. Lee, Eul-Bum; Thomas, D., Accelerated reconstruction of I-15 devore corridor, Public Roads, Volume 70 (Issue 4), 2007.

    51. Lee, Eul-Bum; Choi, K.H., Dynamic Approach to Public Outreach for Minimizing Traffic Inconvenience in Urban Highway Rehabilitation, Preprints of the Transportation Research Board 85th Annual Meeting (CD-ROM: paper no: 06-1817), Transportation Research Board, National Research Council, Washington, D.C., 2006.

    52. Lee, Eul-Bum; Choi, K., Innovative fast-track approach to concrete pavement rehabilitation in urban highway network, Paper No. 15359, Airfield and Highway Pavements Meeting Today's Challenges with Emerging Technologies, ASCE, Atlanta, Georgia, April. 30-May. 3, 2006, pp. 897–911.

    53. Lee, Eul-Bum; Samadian, M., CA4PRS (Construction Analysis for Pavement Rehabilitation Strategies) Software, Focus, Federal Highway Administration, June, 2006;

    54. Lee, Eul-Bum; Kim, C.M.; Harvey, J.T, Traffic demand reduction using an automated work zone information system for urban freeway rehabilitation, Applications of Advanced Technology in Transportation - Proceedings of the Ninth International Conference on Applications of Advanced Technology in Transportation, Chicago, Illinois, August. 13-16, 2006, pp. 653–658;

    55. Lee, Eul-Bum; Choi, K.; Harvey, J.T., Productivity Issues and Lessons-Learned From Two Long-Life Urban Freeway Concrete Rehabilitation Projects In California, International Conference on Long-Life Concrete Pavements, Federal Highway Administration, Chicago, Illinois, October. 24-27, 2006;
    http://www.fhwa.dot.gov/pavement/concrete/2006conf.cfm

    56. Lee, Eul-Bum; Thomas, D., Handling the demand: Automated Work Zone Information System have been reducing traffic demand through construction work zones, Safety 2006, Road and Bridges, Scranton Gillette Communications, Inc., pp. 6-9.

    57. Lee, Eul-Bum; Harvey, J.T.; Kim, C.M., Application of Macro- and Microscopic Simulations for the Traffic Planning of Urban Highway Reconstruction, Preprints of the Transportation Research Board 84th Annual Meeting (CD-ROM: paper no: 05-1552), Transportation Research Board, National Research Council, Washington, D.C., January, 2005.

    58. Lee, Eul-Bum; Samadian, M.; Lee, H. J., Accelerated Pavement Rehabilitation on Urban Highways: innovative approach in California (paper # 7448), Construction Research Congress, ASCE, San Diego, CA, April. 5-7, 2005.

    59. Lee, Eul-Bum; Harvey, J.T.; Choi, K.H.; Thomas, K.D., Innovative approach to rapid rehabilitation of concrete pavement on urban highway, International Society for Concrete Pavements, 8th International Conference on Concrete Pavements, Colorado Springs, Colorado, Aug. 14-18, 2005, Volume 3, pp. 1066–1086.

    60. Harvey, J.T.; Lee, Eul-Bum; Lamour V.; Kannekanti, V.; Bian, Y., Concrete pavement in desert environments: An investigation of design and construction issues, International Society for Concrete Pavements, International Conference on Concrete Pavements, Colorado Springs, Colorado, Aug. 14-18, 2005, Volume 1, pp. 299–321.

    61. Lee, Eul-Bum; Ibbs, C.W.; Harvey, J.T., Innovation and Technologies for Accelerated Highway Rehabilitation Projects: CA4PRS Implementation, paper no.: PICM05-0058, International Conference on Construction Engineering and Management, Seoul, South Korea, Oct. 16-19, 2005.

    62. Lee, Eul-Bum; Kim, C.M.; Harvey, J.T., Evaluation of Automatic Work Zone Information System for Urban Freeway Reconstruction with High Traffic Volume, Paper: 4070, 12th ITS World Congress, San Francisco, California November. 6-10, 2005.

    63. Lee, Eul-Bum; Kim, C.M., A Validation Study of Microscopic Traffic Simulations for Urban Freeway Reconstruction with High-traffic Volume, Paper No.: 4760, 12th ITS World Congress, San Francisco, California, November. 6-10, 2005.

    64. Lee, Eul-Bum; Choi, K.; Harvey, J.T., Pre- and Post-construction Analysis of Interstate 15 (Devore) Concrete Pavement Reconstruction Project, Research report submitted to California Department of Transportation (UCPRC-RR-2005-14), University of California at Berkeley, Institute of Transportation Studies, UC Pavement Research Center, December, 2005.

    65. Lee, Eul-Bum; Lee, HJ; Monismith, C; Harvey, J.T, Fast-Track Asphalt Concrete Pavement Rehabilitation on I-710 Long Beach (CA) during 55-hour Weekend Closures, Preprints of the Transportation Research Board 83rd Annual Meeting (CD-ROM: paper no: 04-3156), Transportation Research Board, National Research Council, Washington, D.C., January, 2004.

    66. Lee, Eul-Bum; Harvey, J. T.; Samadian, M., CA4PRS Generates Pavement Rehabilitation Strategies, TR News, Transportation Research Board, Washington, D.C., Number 232, May-June, 2004, pp. 12-13;
    http://onlinepubs.trb.org/onlinepubs/trnews/trnews232.pdf

    67. Lee, Eul-Bum; Harvey, J.T., A Construction Planning and Evaluation Tool for Urban Freeway Rehabilitation Projects, International Society for Asphalt Pavements, International Conference: Design and Construction of Long Lasting Asphalt Pavements, Auburn University, Alabama, June. 7-9, 2004.

    68. Lee, Eul-Bum; Harvey, J.T.; M., Samadian, CA4PRS software generates pavement rehabilitation strategies, TR News,2004, no. 232, pp. 12–13.

    69. Lee, Eul-Bum; Roesler, J.R.; Harvey, J.T.; Ibbs, C.W., Case Study of Urban Concrete Pavement Reconstruction and Traffic Management for the I-10 (Pomona, CA) Project, Research Reports and Findings (Contract No: DTFH61-99-X-00008), Federal Highway Administration (FHWA) and Innovative Pavement Research Foundation (IPRF), Falls Church, VA, 2000; http://www.dot.ca.gov/research/roadway/llprs/final_iprf_report_i-10_project.pdf